Michigan — C-PACE state brief

Enabled and operating in participating local jurisdictions; not universal statewide coverage. Michigan's Property Assessed Clean Energy Act is Public Act 270 of 2010. The statutory history gives December 14, 2010 as its effective date. Federal DOE research distinguishes the law from Lean & Green Michigan's 2012 launch and first closed project in 2015. It records 65 closings by the end of 2022—not a current total. Michigan compiled law, DOE study, February 2024.

Local evidence first. Financing availability is not assumed.

Status and history

Acts 106 and 107 of 2023 took effect February 13, 2024. Changes expanded environmental-hazard measures and revised new-construction/savings requirements. A local program report may also need updating; Ingham County's page explicitly describes that local process after state amendment. Statutory history, Ingham County.

Responsible organization and local availability

Lean & Green Michigan (LAGM) is a third-party administrator for member local governments; the local jurisdiction approves the assessment. It is not a statewide grant agency. Contact: info@leanandgreenmi.com; 313-444-1474. Current program guidance is its 2025 manual. LAGM FAQ, 2025 manual.

Oakland County's current page reports LAGM operates 63 local programs covering 85% of Michigan's population. Treat this as an undated page statistic checked October 28, 2026, not a frozen exhaustive membership list. Confirm the particular city/county and applicable program report. Oakland County.

Commercial, industrial, agricultural, multifamily and nonprofit property can qualify. Government and single-family property are excluded from the cited local guidance. Measures include energy/water efficiency, renewables and environmental-hazard mitigation; retrofit, adaptive reuse, new construction and qualifying refinancing are possible. Oakland describes a three-year refinancing lookback. Oakland County.

The law requires written mortgage-holder consent, a voluntary owner contract, nondelinquent property obligations and an assessment term no longer than project useful life. The assessment is a property lien; its continuing property-based obligation must be addressed during sale/refinancing. Michigan Act, §§9–13.

Practical sequence: eligibility/local participation → contractor and audit/modeling → capital-provider underwriting and mortgage consent → special-assessment documentation → local approval and recording → funding → installation and performance reporting. Do not repeat old FAQ claims that every project over $250,000 must meet an unwaivable savings guarantee: the 2025 manual allows owner waiver, and newer construction follows its separate code-based standard. FAQ, 2025 manual.

Documented project

Documented project
Project / placeDate evidencedType / C-PACE amountStatus supported
Exchange, Detroit Greektown; Wayne County districtDecember 2020 administrator case study16-story commercial/multifamily new construction; $13 million financed; Greenworks LendingCase study reports amount financed, HVAC/roof/windows/low-flow fixtures and planned future completion. It does not establish actual construction completion or measured savings. LAGM case study

Local applicability, resilience and permits

Local adoption: Ingham County's post-amendment program-report process demonstrates why the 2024 state expansion must be checked against the locally adopted report. LAGM describes qualifying environmental-hazard categories including contaminated drinking water, flood/drought mitigation, severe-weather resilience and lead-paint mitigation. New construction must exceed Michigan's energy code under the revised program framework. Do not infer every hazard-exposed property or every hardening measure qualifies. Ingham County report process, LAGM categories.

Detroit example: BSEED requires trade permits for new work, alterations and changes to mechanical, plumbing, electrical, elevator and boiler systems. Michigan LARA instructs applicants to identify the proper state/county/local enforcing agency before mechanical work; a C-PACE approval is not that permit. Confirm occupancy, code version, local report, hazard-specific engineering and permit scope. Detroit trade permits, LARA jurisdiction/permit guidance.

VERADUCT next steps and exact gaps

  • Confirm a prospect's member jurisdiction and locally adopted post-2024 report before qualifying its measures.
  • Apply the dated manual rather than mixing legacy FAQ language with revised law.
  • Obtain current closed-project export, project-specific consent/assessment instruments, construction completion and measured-performance evidence before expanding case-study claims.
  • No project interest-rate offer, guaranteed return or grant entitlement is asserted.

Additional verification limits

Items requiring further confirmation: Local post-amendment adoption; manual versus legacy FAQ; actual completion/performance.

Continue your project research

Compare the national C-PACE financing structure; Organize state and local project requirements; Prepare a commercial-building improvement scope. This page provides guidance only; it does not accept an application or submit information to a provider.

References

  1. www.legislature.mi.gov (n.d.) Michigan compiled law. Available at: https://www.legislature.mi.gov/%28S%28lgvw2x55gzefle55x5js1c45%29%29/documents/mcl/pdf/mcl-chap460.pdf (Accessed: 2026-10-28 UTC). Transferred source review; current parcel, transaction and outcome limits are stated in the guide. Not a new integrator retrieval.
  2. www.energy.gov (n.d.) DOE study, February 2024. Available at: https://www.energy.gov/sites/default/files/2024-04/scep-cpace_feb2024.pdf (Accessed: 2026-10-28 UTC). Transferred source review; current parcel, transaction and outcome limits are stated in the guide. Not a new integrator retrieval.
  3. docs.ingham.org (n.d.) Ingham County. Available at: https://docs.ingham.org/departments_and_officials/treasurer/pace_program.php (Accessed: 2026-10-28 UTC). Transferred source review; current parcel, transaction and outcome limits are stated in the guide. Not a new integrator retrieval.
  4. www.leanandgreenmi.com (n.d.) LAGM FAQ. Available at: https://www.leanandgreenmi.com/faq/ (Accessed: 2026-10-28 UTC). Transferred source review; current parcel, transaction and outcome limits are stated in the guide. Not a new integrator retrieval.
  5. leanandgreenmi.com (n.d.) 2025 manual. Available at: https://leanandgreenmi.com/wp-content/uploads/2024/02/Lean-Green-Michigan-Program-Manual-2025.pdf (Accessed: 2026-10-28 UTC). Indexed PDF content reviewed; later direct fetch returned 404.
  6. www.oaklandcountymi.gov (n.d.) Oakland County. Available at: https://www.oaklandcountymi.gov/business/business-development/pace-financing (Accessed: 2026-10-28 UTC). Transferred source review; current parcel, transaction and outcome limits are stated in the guide. Not a new integrator retrieval.
  7. www.leanandgreenmi.com (n.d.) LAGM case study. Available at: https://www.leanandgreenmi.com/casestudy/exchange-2/ (Accessed: 2026-10-28 UTC). Transferred source review; current parcel, transaction and outcome limits are stated in the guide. Not a new integrator retrieval.
  8. detroitmi.gov (n.d.) Detroit trade permits. Available at: https://detroitmi.gov/departments/buildings-safety-engineering-and-environmental-department-bseed/trade-permits (Accessed: 2026-10-28 UTC). Transferred source review; current parcel, transaction and outcome limits are stated in the guide. Not a new integrator retrieval.
  9. www.michigan.gov (n.d.) LARA jurisdiction/permit guidance. Available at: https://www.michigan.gov/lara/bureau-list/bcc/sections/permit-section/permits/mechanical-permit-information (Accessed: 2026-10-28 UTC). Transferred source review; current parcel, transaction and outcome limits are stated in the guide. Not a new integrator retrieval.

Written by VERADUCT Editorial. Herve Drompt, VERADUCT Owner — publication authorized; not professional or legal review. Page version 1.0.1. Publication authorization is not professional, legal or scientific peer review.