Research checked: October 28, 2026. Status: operating programs in identified localities, including Nashville/Davidson County and Memphis; not automatic statewide financing.
Background and launch chronology
Tennessee enacted the Commercial Property Assessed Clean Energy and Resilience Act through Public Chapter 138 of 2021, SB 795/HB 667, effective July 1, 2021. The framework is codified at Tennessee Code Annotated 68-205-101 and following. Public Chapter 868 of 2022 subsequently revised the framework; use current program/legal documents rather than treating the original 2021 bill as the last word. TN01, TN02
Nashville's sequence demonstrates why dates must remain distinct: a statement of intent and October 4, 2022 hearing preceded adoption. Ordinance BL2022-1633 passed its final Council reading January 17, 2023 and received mayoral approval January 23. The Metropolitan Trustee reports bringing the operating program to that office in 2023. This is local adoption/launch evidence, not a claim that every Tennessee county launched then. TN03, TN07
Who administers the programs?
Nashville/Davidson County: the Office of the Metropolitan Trustee is the designated program administrator. Its current program page supplies guidelines, application checklist, assessment agreement, lienholder/ground-lessor consents and completion certificates. Trustee Erica Gilmore's 2026 official newsletters confirm continuing transaction activity. Private capital providers fund projects; annual assessments are billed/collected with property taxes and remitted to the lender. TN03, TN04, TN06, TN07
Memphis: the Economic Development Growth Engine (EDGE) maintains the C-PACER program and guidebook. The owner requests a City of Memphis assessment, which repays private capital. EDGE explicitly distinguishes the tool from tax reduction, grants and other public funding. Its local requirements differ from Nashville's and must not be used as a statewide rule. TN08
These are verified operating examples, not a comprehensive current list of participating Tennessee jurisdictions. A third-party platform's statewide name or a municipality's hearing agenda alone is not proof of an active local program.
Eligible properties and improvements
Nashville's ordinance covers privately owned commercial, industrial, agricultural and five-plus-unit multifamily property, including eligible nonprofit ownership and certain government-owned/private-lease arrangements. Its financing framework includes efficiency, renewables, water conservation and resilience. TN03
The currently linked Nashville guidelines include lead reduction in drinking water and resilience categories such as flood mitigation, stormwater management, wind resistance, energy storage and microgrids. Existing-building resilience projects require professional certification of improvement; new construction requires certification of performance beyond applicable county building-code requirements in the relevant category. An HVAC/ventilation project needs a documented qualifying scope, not merely a claim that newer equipment is greener. TN05
Consent, lien, repayment and project process
Nashville's application package separates technical certificates, financial documentation and lienholder approvals. Nashville's ordinance requires the capital provider to receive written consent from every mortgage or deed-of-trust holder before entering into the Financing Agreement. The currently linked guidelines separately require mortgage/deed-holder and applicable ground-lessor consent before the Assessment Agreement and describe holding county closing signatures in escrow until consent is obtained. Confirm the operative sequence with the Trustee and transaction counsel; do not assume consent can always wait until closing. The ordinance describes a recorded property lien that runs with the land, and financing repayment through annual assessment installments. Terms must respect improvement useful life. Sale, refinancing, prepayment and delinquency consequences should be explained from the actual signed documents, not through blanket claims that transfer is effortless or foreclosure impossible. TN03, TN04, TN05
A sensible sequence is: confirm active jurisdiction and eligible parcel; scope permanent improvements and obtain professional analysis; secure lender terms and all required consents before their applicable agreement triggers, including mortgage/deed-holder consent before the Financing Agreement; submit the local application; execute and record assessments; disburse under the financing agreement; obtain completion/installation verification; then service annual payments. A conditional application approval is not a funded project.
Known Nashville projects
| Project | Amount and date | What is established |
|---|---|---|
| Hotel development, 3818 Bedford Avenue | $14.1 million; official May 5, 2026 newsletter | Trustee reports the program's twelfth deal closed. Three-story hotel development; construction completion is not established by the financing announcement. TN06 |
| M.L.Rose / multi-tenant retail property, 3701 Gallatin Pike, Inglewood | $1.7 million; official June 2, 2026 newsletter | Retroactive financing for a completed gut rehabilitation. This source expressly supports completed rehabilitation, unlike many new-construction closing releases. Financing closing day is not separately supplied. TN07 |
| Dickerson Pike multifamily/townhome development | $13.4 million; official May 5, 2026 newsletter | The newsletter says the deal was shared in the prior month; this does not establish its closing month. Exact address, financing closing date and construction completion require further verification. Do not merge differing unit counts from earlier pipeline notices. TN06 |
Amounts are private financing, not grant awards. The examples do not establish a complete statewide portfolio or measured energy savings.
Local applicability and code verification
Memphis: EDGE's website describes improvements exceeding $1 million and local code, energy/water and resilience criteria. Its linked September 21, 2022 handbook describes a best-faith effort toward at least 25% MWBE participation on qualifying costs, not an unconditional quota on total development cost. The handbook uses both an at-least-$1-million improvement floor and qualifying-cost language exceeding $1 million: the exact $1 million boundary, applicable cost base and current implementation need administrator confirmation. These are Memphis-specific conditions, not Nashville or statewide thresholds. TN08, TND22
Nashville uses its own technical certification, economic-benefit and consent forms. BL2022-1634 passed its final reading on January 17, 2023 and received mayoral approval on January 23, approving forms substantially as Collective Exhibit A; that exhibit already contained the “PROPOSED” footer. The footer alone therefore does not establish non-adoption. This does not prove that every current live-linked template is byte-identical to the approved exhibit or that later material changes were authorized. Confirm the operative version and the ordinance's Council-resolution boundary for material changes with the administrator and counsel. TN04, TN05, TND26, TND27
For both localities, confirm current local building/energy codes, occupancy, permits and any floodplain, fire, stormwater or utility requirements independently. Resilience eligibility is not a building-code waiver. The exact address-specific flood/wind permit conditions and a comprehensive statewide local-ordinance map were not established in this review.
Prepare the local review before paying for a financing package
Start with a parcel-and-owner summary: the legal description or parcel identifier, the responsible locality, the record owner, proposed improvements and project stage. Mark costs and technical assumptions that are still unknown. A tenant's construction budget or a familiar business name is not a substitute for identifying the real-property interest and the parties who can authorize an assessment. Request the current application package before treating every construction cost as financeable. Nashville program materials, Memphis handbook
For Nashville/Davidson County, direct program-document questions to the Metropolitan Trustee. For Memphis, establish the actual City of Memphis parcel boundary before relying on EDGE's wider organizational name. MLGW's published C-PACER reference identifies commercial properties in the City of Memphis; an MLGW account, a Memphis postal address or a Shelby County parcel record does not by itself confirm financing coverage. For another locality, obtain its own adoption and administrator evidence. Nashville program, MLGW locality reference
Keep three decisions separate in the same evidence file: the administrator's program and document review; the capital provider's proposed financing terms; and the responsible authorities' technical, permit and occupancy decisions. Ask who prepares, signs and checks each item, and what remains outstanding before the next agreement or installation. An engineering or financing indication does not replace construction approval. The consent triggers and operative-form limitations described in this guide still apply. Prepare the separate requirement checks.
Nashville: turn an unknown cooling problem into an evidence worksheet
An owner can start with high cooling costs without knowing the replacement technology or budget. Nashville's linked A-7 certificate asks about the technical professional, information reviewed, proposed improvements and estimated useful lives; it distinguishes existing buildings from new construction. Use those fields to prepare questions, not to certify your own eligibility. The worksheet below is VERADUCT's original preparation framework, not an official application or a new program requirement. Nashville A-7, PDF pages 1–3
| Working field | What to record now | Question for the responsible professional |
|---|---|---|
| Problem and baseline | The observed cooling problem, available bills or operating records, and missing information. | What comparison can these records support, and what assessment is still needed? |
| Proposed measure | Equipment or design options, including an unknown or undecided option. | What specification and permanent installation would support the proposed scope? |
| Expected outcome and useful life | The claimed qualifying outcome, useful-life assumption and supporting calculation or document. | Which assumptions are supported, and which must remain estimates? |
| Technical responsibility | The practitioner, their project role and the information they reviewed. | Who can substantiate and sign the applicable certification? |
| Next decision | The missing evidence, responsible person and next question before paying for a final package. | Does the current code baseline or a separate permit/utility decision change the scope? |
A contractor quote describes price; it does not itself substantiate the technical outcome. For new construction, the linked certificate calls for a comparison with the relevant current county-code requirements. Ask the design professional and authority to establish the applicable baseline rather than assuming the form's upload year supplies it. A working download does not establish today's operative form: BL2022-1634 approves forms substantially as its exhibit, while section 3 reserves material party-obligation changes or new Metro obligations for Council resolution. Current-template identity and later changes remain unconfirmed here. A-7, page 2, Forms ordinance, sections 1–3, Original exhibit, PDF pages 48–50
Memphis: check the transaction file and the completed work separately
Before comparing offers, request a written breakdown of money reaching construction versus fees or reserves, interest and installment timing, and conditions for each disbursement. These are owner-side due-diligence questions, not published prices or a promise that every offer has the same structure. Use the financing comparison guide alongside the separate requirements review.
| Decision or milestone | Evidence to request | What it must not be confused with |
|---|---|---|
| Proposed transaction | Reconcile owner names, parcel/legal description, approved scope, assessment principal and payment schedule across the proposed documents. | A contractor total or application approval is not a complete financing package. |
| Signing and recording | Ask counsel and EDGE which executed instruments, required consents and recording evidence govern this transaction. | A blank downloadable notice is not a signed or recorded assessment. |
| Disbursement | Ask the capital provider what conditions release funds, which costs are funded and how changes or delays are handled. | Approval or a recorded obligation alone is not evidence that money reached construction. |
| Installation and completion | Plan responsibility for installation records, inspections, commissioning and the applicable completion certification. | A financing closing is not completed work or measured operating savings. |
The handbook still linked by EDGE is dated September 21, 2022. Its Attachment C identifies the owner, parcel, assessment principal and terms in a notice-of-lien template; Attachment H separately records application approval and financing closing, then asks the owner to certify completed work and intended operation. Those blank fields do not prove any actual transaction. Confirm current forms, signatures and the earliest binding consent requirement with EDGE and counsel; this review does not clear later amendments or make the handbook's dated fees, thresholds or calendar current. Memphis handbook, Attachment C, PDF pages 36–39; Attachment H, pages 49–50, EDGE's current guidebook link
Memphis project evidence: approval is not a closing
One Memphis Place, at 200–202 Jefferson Avenue, illustrates why a sponsor should keep amounts and milestones in separate fields. EDGE's exact database object—record 71261, project ED20240901C—lists a $1.7 million Loan Amount and a September 2024 approval-date field. The labeled loan field is approved-record evidence, not verified disbursement or an independently established vote date. Its narrative also contains a malformed loan figure; this guide uses the labeled field rather than silently repairing that text. EDGE One Memphis record
| Source label | Published figure | What it does not establish |
|---|---|---|
| EDGE database Loan Amount | $1.7 million | Actual funded principal or a financing closing. |
| Database qualifying-measures narrative | $2,985,320 | The C-PACER loan principal or an audited total development cost. |
| FY 2024–2025 report's renovation description | $1.7 million | Proof that the report's cost label and database measure scope are the same. |
| That report's broader financing package | $17.6 million | A $17.6 million C-PACER loan. |
The annual report and database describe different cost scopes that remain unreconciled. The database closing-date field is empty in the reviewed capture; this means missing confirmation, not proof that the transaction never closed. Actual funding, exact closing, construction completion and measured operating savings are not established here. For a comparable project, request the relevant signed, recorded, disbursement and completion evidence instead of promoting an approval or forecast into a completed result. EDGE project record, EDGE FY 2024–2025 report, printed page 14
The MLGW locality reference, Nashville program page and labeled One Memphis database fields were rechecked on October 29, 2026. This is a scoped reference check, not a new whole-page legal or source census. The older source dates and transaction-specific limits remain visible in the references.
Gaps and next steps
Retrieve the latest consolidated state statute and any subsequent amendments before offering a legal opinion on lien priority or underwriting limits. Verify participating jurisdictions by adopted ordinance plus active administration, not agendas. Confirm Memphis's current qualifying-cost rules and exact $1 million boundary, and Nashville's operative forms, including reconciliation of the ordinance's pre-Financing Agreement consent trigger with the linked guide's Assessment Agreement and escrow provisions. Obtain recorded assessment and current construction status for each showcase project when dates matter. No financing application or outreach was made.
Continue your project research
Use the national C-PACE financing guide to compare the assessment-financing structure and its risks. Then use the state and local requirements guide to organize the parcel, authority and evidence checks that remain. This page does not accept applications or submit information to a provider.
References
- University of Tennessee County Technical Assistance Service (2021) 2021 Index of Acts. Available at: https://www.ctas.tennessee.edu/2021-index-acts (Accessed: 2026-10-28 UTC). Public-university county reference for Public Chapter 138 and July 1, 2021 effective date; not a consolidated current-law opinion.
- Tennessee General Assembly (2022) HB 2033 / SB 1990 legislative history. Available at: https://wapp.capitol.tn.gov/apps/BillInfo/Default?BillNumber=HB2033&GA=112 (Accessed: 2026-10-28 UTC). 2022 amendment history, Public Chapter 868. Later independent retrieval returned 502; enacted PDFs were unavailable. Subsequent-amendment census and current consolidated text remain held.
- Metropolitan Government of Nashville and Davidson County (2023) BL2022-1633 adopted ordinance. Available at: https://nashville.legistar.com/LegislationDetail.aspx?FullText=1&GUID=1FC2BBE9-83E4-4D50-8156-6084724BE307&ID=5967630&Options=&Search= (Accessed: 2026-10-28 UTC). Final reading January 17; mayoral approval January 23, 2023. Local section 5.22.050(3) sets mortgage/deed-holder consent before the Financing Agreement.
- Metropolitan Trustee (n.d.) C-PACER program and materials. Available at: https://www.nashville.gov/departments/trustee/c-pacer (Accessed: 2026-10-30 UTC). Page states last update April 17, 2023; reviewed October 28, 2026. An active local example, not statewide participation or parcel eligibility.
- Metropolitan Trustee (2023) C-PACER Program Guidelines, currently linked copy. Available at: https://www.nashville.gov/sites/default/files/2023-04/CPACER-A1-C-PACER-Program-Guidelines.pdf?ct=1681734102 (Accessed: 2026-10-28 UTC). Retained PROPOSED footer is not proof of non-adoption; compare approved exhibit. Confirm operative template and reconcile Assessment Agreement/escrow sequence with the ordinance's earlier consent trigger.
- Metropolitan Trustee (2026) May 5, 2026 newsletter. Available at: https://content.govdelivery.com/accounts/TNNASH/bulletins/415e6c3 (Accessed: 2026-10-28 UTC). Hotel financing closing reported, not construction completion. Prior-month Dickerson Pike sharing does not establish closing month, address, unit count or completion.
- Metropolitan Trustee (2026) June 2, 2026 newsletter. Available at: https://content.govdelivery.com/accounts/TNNASH/bulletins/41a0ec7 (Accessed: 2026-10-28 UTC). Supports 2023 launch and completed Inglewood gut rehabilitation with retroactive financing; no separate financing closing day.
- Economic Development Growth Engine (EDGE) (n.d.) Memphis C-PACER program overview. Available at: https://edgemem.com/cpacer/ (Accessed: 2026-10-30 UTC). City of Memphis local program. Read minimum and MWBE shorthand with the linked handbook, qualifying costs and current administrator confirmation.
- Economic Development Growth Engine (EDGE) (2022) C-PACER Program Handbook with Attachments (September 21, 2022). Available at: https://edgemem.com/wp-content/uploads/2023/01/Program-Handbook-w-Attachments.pdf (Accessed: 2026-10-30 UTC). Historical 50-page handbook: best-faith effort toward at least 25% MWBE participation on qualifying costs; not an unconditional total-cost quota. Exact $1 million boundary/current implementation remain held.
- Metropolitan Government of Nashville and Davidson County (2023) BL2022-1634 approval of program forms. Available at: https://nashville.legistar.com/LegislationDetail.aspx?FullText=1&GUID=DE5C2C91-FEAC-47BA-B8F1-BD4C62DEF6C6&ID=5967645 (Accessed: 2026-10-30 UTC). Forms approved substantially as Collective Exhibit A on January 17/23, 2023. Section 3 Council-resolution boundary for material changes; not proof of current template identity.
- Metropolitan Government of Nashville and Davidson County (2023) BL2022-1634 Collective Exhibit A. Available at: https://nashville.legistar.com/View.ashx?M=F&ID=11522995&GUID=B6AE1F96-92AA-4CB2-B4D6-51ACA9B502FC (Accessed: 2026-10-30 UTC). Approved exhibit already retained PROPOSED footer. Current live-template identity and subsequent amendments were not established.
- Memphis Light, Gas and Water (n.d.) Green Power: City of Memphis C-PACER reference. Available at: https://www.mlgw.com/about/mlgwgreenpowerswitch (Accessed: 2026-10-29 UTC). City-specific reference only. No parcel, intake, generation-price, tax, payback, interconnection or insurance determination; dated tax commentary not used.
- Economic Development Growth Engine (n.d.) One Memphis C-PACER Loan, record 71261 / ED20240901C. Available at: https://database.edgemem.com/loans/loan/71261/ (Accessed: 2026-10-29 UTC). Exact embedded public object: labeled LoanAmount 1700000, raw approval date 2024-09-19, blank DateClosed. Approved-record amount, not actual funded principal; no closing/completion/savings inference from absent fields. Narrative typo and cost-scope differences retained.
- Economic Development Growth Engine (2025) FY 2024–2025 Progress Report, printed page 14. Available at: https://edgemem.com/wp-content/uploads/2025/10/EDGE-FY-2024-2025-Progress-Report_FINAL.pdf (Accessed: 2026-10-28 UTC). Transferred accepted author/independent review of printed page 14; not freshly retrieved here. Renovation and broader-package figures do not establish exact funded principal, closing, completion or measured results.
- Metropolitan Government of Nashville and Davidson County, Office of the Metropolitan Trustee (2023) Linked Exhibit A-7: Energy, Water, Resilience Compliance, PDF pages 1–3. Available at: https://www.nashville.gov/sites/default/files/2023-08/CPACER-A7-Energy-Water-Resilience-Certificate.pdf?ct=1691500707 (Accessed: 2026-10-30 UTC). Fresh direct download and visual/text review of three pages. Technical fields and new-construction comparison only; not a signed certificate, current operative-form determination or project-specific code/eligibility decision. Numbering/layout differs from original Collective Exhibit A pages48–50; no materiality or lawful-amendment determination inferred. Historical individual-file403 remains historical, not current retrieval status.
Written by VERADUCT Editorial. Herve Drompt, VERADUCT Owner — publication authorized; not professional or legal review. Page version 1.2.0. Publication authorization is not professional, legal or scientific peer review.