Virginia C-PACE: local requirements and verification

Virginia first enacted enabling legislation in 2009, substantially amended it in 2015, and authorized a statewide sponsored program in 2020. Virginia Energy reports that the statewide platform launched in September 2022; local governments may join it or operate independent programs. VA01

Local evidence first. Financing availability is not assumed.

Background and milestones

Local implementation predates that platform: Arlington approved its ordinance on November 18, 2017 and launched the state's first program in January 2018. Its 2021 Rocklands transaction illustrates why a law's enactment, a local program's opening, and a financed project must be tracked separately. VA02VA03VA07

Who is responsible now?

Statewide sponsor: Virginia Department of Energy (Virginia Energy). Statewide administrator: nonprofit Virginia PACE Authority (VPA). Virginia Energy selected VPA competitively, with Slipstream technical support. VPA's 2024–2025 annual report identifies Abby Johnson as Executive Director and Ellen Dickson as Outreach and Senior Project Manager/closing coordination lead. These are dated organizational facts, not promises of future tenure. VA01VA04

Arlington's independent program identifies the county's AIRE team as sponsor and Sustainable Real Estate Solutions (SRS) as administrator. Do not route all Virginia properties to the same administrator without checking locality. VA05

Availability and eligibility

The current VPA participant page lists numerous cities and counties, including Fairfax County, Loudoun, Henrico, Chesterfield, Prince William, Albemarle, Richmond, Virginia Beach, Harrisonburg, and others. It lists Lynchburg while marking its ordinance “coming soon,” so the page alone is not sufficient to clear a Lynchburg closing. Obtain the adopted ordinance and executed participation documents for the subject parcel. VA06

Current Code §15.2-958.3 includes assessable commercial real estate, multifamily with at least five units, qualifying association common areas and commercial condominiums; limited ground-lease structures are also addressed. Improvements include energy and water efficiency/safe drinking water, renewable energy, resilience, stormwater management, environmental remediation and EV infrastructure. A local program can authorize refinancing/reimbursement applications within three years of the relevant certificate of occupancy/compliance evidence. VA08

The program supports existing-building improvements, adaptive reuse and new construction. Eligible cost determination and technical approval are project-specific. VA09

The owner works with a qualified professional to establish scope, checks local program eligibility, submits a pre-application and technical documentation, selects a registered private capital provider, and completes lender-consent and closing documents. Under the statewide program, capital providers generally bill/collect directly, with VPA able to service when required; this should not be described universally as an item automatically collected on the ordinary tax bill. VA09

The voluntary special-assessment lien has property-tax-lien priority, but priority over existing mortgages/deeds of trust requires each relevant holder's recorded written subordination agreement and statutory owner/property certifications. It runs with the land; future installments are not extinguished by property-tax-lien foreclosure. Delinquent amounts may be enforced as tax liens, with penalties and costs. Obtain transaction-specific legal advice rather than treating transferability or non-acceleration as a guarantee of no borrower risk. VA08

Documented projects

Documented projects
ProjectPlace / evidence dateAmount / improvementVerified status
Rocklands Barbeque and adjoining propertyArlington; county announcement July 6, 2021Roof upgrades and two solar systems totaling 44 kW; financing amount not disclosed in county sourcePrivate financing by Arlington Community Federal Credit Union announced as Virginia's first use. Owner's April 2025 account confirms the Arlington location subsequently went solar; exact commissioning date is not reconciled. VA07VA10
Hotel BurgLeesburg, Loudoun County; county report July 17, 2024Nearly $4 million C-PACE financing for HVAC, lighting, envelope and water improvementsThe county report described Hotel Burg as funded and the first C-PACE project in Leesburg. Source does not prove hotel completion or measured operating savings. VA11
Former Dominion Energy tower, 707 East Main StreetRichmond; January 1, 2026 city announcementHotel/apartment adaptive reuse; amount not disclosed by cityCity reported first successful use of its program. Announcement describes future conversion, not completed construction. VA12

VPA's annual report separately reports two closings totaling $4.7 million in Harrisonburg and Loudoun during its 2024–2025 reporting period. Its reported pipeline exceeding $200 million is not closed financing and must not be added to completed volume. VA04

Practical next steps and editorial cautions

Verify locality participation, current administrator, technical eligibility and lienholder consent before seeking terms. Confirm fees, useful-life limits and refinance lookback in the current local program guide. Older pages conflict with current law: Fairfax's overview excludes multifamily of five units or fewer and condos, while the current statute includes five-unit multifamily and commercial condos; VPA's 2022 FAQ gives a 24-month lookback while current law permits a three-year provision. Use current code plus administrator confirmation, not those stale summaries, for eligibility. VA08VA09VA13

Evidence gaps: complete transaction-level register; latest individual project construction outcomes; executed documents for newly listed jurisdictions. None of the listed amounts is identified here as a public grant, an interest-rate quote, or guaranteed savings.

Local applicability and permit verification

Use the locality's current ordinance and actual administrator: independent Arlington and the VPA platform need not have identical procedures. The current statute permits multiple resilience-related categories, but technical eligibility and the local program's adoption of those categories must be established for the individual scope. Coastal exposure alone does not confer eligibility. Verify building, floodplain, stormwater, remediation and utility permits separately; financing approval is not code approval. Exact local code editions and address-specific wind/flood criteria were not established and remain verification gaps. VA05, VA06, VA08

Additional verification limits

Items requiring further confirmation: Current local guides conflict with older summaries; project completion updates. Arlington independent vs VPA; stale guides must be reconciled; local permits independent.

Continue your project research

Compare the national C-PACE financing structure; Organize state and local project requirements; Prepare a commercial-building improvement scope. This page provides guidance only; it does not accept an application or submit information to a provider.

References

  1. energy.virginia.gov (n.d.) Virginia Energy C-PACE overview. Available at: https://energy.virginia.gov/energy-efficiency/PACE.shtml (Accessed: 2026-10-28 UTC). Dated source; not proof of all localities or later project completion
  2. www.arlingtonva.us (n.d.) Arlington's first-program announcement. Available at: https://www.arlingtonva.us/About-Arlington/Newsroom/Articles/2017/Arlington-First-in-Virginia-with-New-Financing-Tool-for-Sustainable-B (Accessed: 2026-10-28 UTC). Dated source; not proof of all localities or later project completion
  3. energy.virginia.gov (n.d.) 2018 Virginia Energy Plan. Available at: https://energy.virginia.gov/energy-efficiency/documents/2018VirginiaEnergyPlan.pdf (Accessed: 2026-10-28 UTC). Dated source; not proof of all localities or later project completion
  4. www.arlingtonva.us (n.d.) Arlington's Rocklands announcement. Available at: https://www.arlingtonva.us/About-Arlington/Newsroom/Articles/2021/Arlington-County-Helps-Put-Solar-Financing-on-the-Menu-in-Historic-Fi (Accessed: 2026-10-28 UTC). Dated source; not proof of all localities or later project completion
  5. virginiapace.com (n.d.) VPA 2024–2025 annual report. Available at: https://virginiapace.com/wp-content/uploads/2026/04/VPA-Annual-Report-2024-2025-1.pdf (Accessed: 2026-10-28 UTC). Program-specific current or dated claims; local legal adoption must be checked
  6. arlington-pace.us (n.d.) Arlington C-PACE capital-provider FAQ. Available at: https://arlington-pace.us/capital-providers/faqs/ (Accessed: 2026-10-28 UTC). Program-specific current or dated claims; local legal adoption must be checked
  7. virginiapace.com (n.d.) VPA locality list and ordinances. Available at: https://virginiapace.com/program-map/ (Accessed: 2026-10-28 UTC). Program-specific current or dated claims; local legal adoption must be checked
  8. law.lis.virginia.gov (n.d.) Code of Virginia §15.2-958.3. Available at: https://law.lis.virginia.gov/vacode/title15.2/section15.2-958.3/ (Accessed: 2026-10-28 UTC). Dated source; not proof of all localities or later project completion
  9. virginiapace.com (n.d.) VPA FAQ. Available at: https://virginiapace.com/wp-content/uploads/2022/09/C-PACE-FAQ-Fall-2022.pdf (Accessed: 2026-10-28 UTC). 2022 FAQ operational context; outdated lookback flagged against current statute
  10. rocklands.com (n.d.) Rocklands owner update. Available at: https://rocklands.com/blog/grilling-goes-green-rocklands-bbq-is-leading-the-way-in-sustainable-dining/ (Accessed: 2026-10-28 UTC). Owner report of solar operation; exact commissioning date unresolved
  11. loudoun.granicus.com (n.d.) Loudoun county energy-strategy update. Available at: https://loudoun.granicus.com/MetaViewer.php?clip_id=7714&meta_id=249070&view_id=89 (Accessed: 2026-10-28 UTC). Does not establish first in all Loudoun County, exact amount, construction completion or achieved savings.
  12. www.rva.gov (n.d.) Richmond first-use announcement. Available at: https://www.rva.gov/index.php/press-releases-and-announcements/news/city-richmond-celebrates-first-use-c-pace-program-support (Accessed: 2026-10-28 UTC). Dated source; not proof of all localities or later project completion
  13. www.fairfaxcounty.gov (n.d.) Fairfax program overview. Available at: https://www.fairfaxcounty.gov/environment-energy-coordination/c-pace (Accessed: 2026-10-28 UTC). Dated source; not proof of all localities or later project completion

Written by VERADUCT Editorial. Herve Drompt, VERADUCT Owner — publication authorized; not professional or legal review. Page version 1.0.1. Publication authorization is not professional, legal or scientific peer review.